2010 – Central Plant Pipe Abandonment
Abandon over half mile of 30" Condenser Line serving the "Central Plant" State Building cooling and heating system.
MRPE surveyed, mapped and designed the abandonment of this 30" pipeline in coordination with contractor
A flowable air-entrained low density concrete foam was utilized to fill this pipeline along with entry and exit bulkheads.