2014 – 65th Avenue Storm Drain Diversion

Place half mile of new 54" storm drain diverting stormwater to reduce flooding.

MRPE surveyed, designed, drafted plans and supported construction of this drainage pipe from 65th Avenue to a future detention basin in 24th Street.  

This project utilized MRPE background from the Basin 54 drainage study along with surveying and design skills to rapidly complete this pipe extending through roads and private properties.