what we do

System Development, Research, Estimating Matt Rodgers System Development, Research, Estimating Matt Rodgers

2001 – 5-Year Sacramento Sewer Capital Improvement Program

Create 5-Year Capital Improvement Program (CIP) for all City of Sacramento Sewer and Combined Sewer Projects, and develop user interface for database

MRPE collected and logged all records related to infrastructure condition and age, developed database of anticipated projects and generated system to access and modify data.

The data provided included old pipeline TV reports, old CIP plans and utilized the retired superintendent to assist with translating everything into a viable capital improvement program.

Read More

2000 – Trunk Sewer Crossing I-5

Feasibility study for micro-tunneling new 84" Combined Sewer Pipeline crossing under I-5 “boat” section

MRPE surveyed Freeway and adjacent properties at crossing, mapped topography and drafted plan & profile drawings

Freeway access required an encroachment permit and specialized safety training. A variety of improvements impacted alignment thru the Freeway and on either side including thickened concrete designed to prevent flotation of freeway during shallow groundwater.

Read More

1999 – Basin 69 Detention Basin at Cosumnes River College

Construct 10 acre Stormwater Detention Basin supporting dual use soccer field and softball diamond, Includes running track, ramps, inlet/outlet structure, pipes up to 84" in diameter, planting and irrigation.

MRPE provided project management and negotiation of agreement between college, Parks and Utilities Departments, land surveying, design and preparation of plans and specs, and bidding and construction support.

MRPE drastically reduced costs for Utilities Department client by getting land dedicated for free by College, and maintenance for free by Parks and College by exchanging another park site and providing specialized mowing equipment.

Read More