what we do
2015 - Sacramento Design & Procedures Manual (DPM) Sections 9, 11 & 13
Update Department of Utility Sections of the City Design & Procedures Manual
MRPE authored Sections 9, 11 & 13 of the City of Sacramento Design & Procedures Manual, which define the requirements for design and master planning of public sewer, combined sewer, stormwater, and potable water improvements. MRPE met with City staff and others dozens of times over seven years, researched County and other local manuals, managed, tabulated and resolved related issues, and wrote these DPM Sections which guide developers in the preparation of plans and studies for public drainage, water and sewer improvements.
Codifying decades of engineering practices into clear, enforceable standards while aligning with evolving City infrastructure policies and balancing technical detail with usability for diverse stakeholders. Matt’s extensive experience in Sacramento made MRPE the obvious choice to bring together the city’s history with varied public and private interests in updating these 30-year-old sections. We helped to create a new vision for City utility master planning and design based on how things were actually being done and how they should be.
2014 – 65th Avenue Storm Drain Diversion
Place half mile of new 54" storm drain diverting stormwater to reduce flooding.
MRPE surveyed, designed, drafted plans and supported construction of this drainage pipe from 65th Avenue to a future detention basin in 24th Street.
This project utilized MRPE background from the Basin 54 drainage study along with surveying and design skills to rapidly complete this pipe extending through roads and private properties.
2013 - Cherokee Estates
Project constructed 15-lot rural subdivision in Placer County.
MRPE surveyed, mapped and design roads, utilities and lot grading.
This project had several complex design issues including stormwater detention, steep roads and owner financing difficulties.
2007 – Sacramento Facility Pollution Prevention Plans (FPPP)
Prepare FPPP documents for all city facilities and create database system for monitoring and recording data regarding toxic spills and pollution prevention activities.
MRPE prepared all documents and generated related database and interface for maintaining system by city staff.
Much of the required information required onsite inspection of facilities and coordination with maintenance personnel.
2006 - Bradman Subdivision
A new residential subdivision in Sacramento, CA
MRPE prepared the improvement plans and the Stormwater Pollution Prevention Plan (SWPPP) for construction of related subdiviosn improvements.
This project had a variety of existing and proposed drainage modifications required to meet County regulations.
1999 – Basin 69 Detention Basin at Cosumnes River College
Construct 10 acre Stormwater Detention Basin supporting dual use soccer field and softball diamond, Includes running track, ramps, inlet/outlet structure, pipes up to 84" in diameter, planting and irrigation.
MRPE provided project management and negotiation of agreement between college, Parks and Utilities Departments, land surveying, design and preparation of plans and specs, and bidding and construction support.
MRPE drastically reduced costs for Utilities Department client by getting land dedicated for free by College, and maintenance for free by Parks and College by exchanging another park site and providing specialized mowing equipment.